Houston, TX · Serving the industrial marketplace across the U.S.

The Problem

The estimating package rarely arrives ready to quote

The difficult package is rarely a finished shop drawing or a completed bill of material. Customers send IFC drawing sets, architectural drawings, structural plans, specifications, schedules and large RFQ packages — and someone has to interpret those documents before an estimator can determine what material needs to be quoted. Today that work can consume days or weeks of skilled estimator time. On fabrication packages, developing takeoffs and quantities from the full drawing set can add days or weeks before pricing can begin; on mechanical projects, a single quote can carry hundreds of line items of pipe, valves, fittings, flanges, bolting and gaskets.

Forged is intended to create an intelligence layer between the customer’s project documents and the estimator — so the estimator begins with structured information rather than a stack of drawings.

Smithco Forged helps organize and structure project information for estimator review and quote development. The physical material and fabrication requirements remain managed through Smithco’s established project execution process.

What customers send

  • IFC drawing sets
  • Architectural drawings
  • Structural drawings and plans
  • Mechanical drawings and schedules
  • Project specifications
  • RFQ / bid packages
  • Material schedules
  • Existing bills of material or line-item lists, when available
  • Detail/shop drawings, when they are actually provided

What the estimator receives

  • Project requirements identified and summarized
  • Material and component identification
  • Structured bill of material / line-item schedule
  • Quantities and takeoff information
  • Material specifications and grades
  • Drawing and specification references
  • Exceptions, missing information and clarification items
  • Lead-time and availability intelligence as the platform develops

Submit a Project Document Package

Send what you would actually send — an RFQ package, drawings, specifications, schedules or an existing BOM. Forged reads the documents, structures the requirements, and routes the package with your originals to Smithco’s estimating team. An estimator follows up directly.

Upload the project documents

Drag files into this area, or choose them from your machine. Up to 6 files, 3 MB total — email larger packages to sales@smithcois.com.

PDF · PNG · JPG · CSV · DXF read automatically — DWG · XLSX · DOCX · TIFF forwarded for estimator review

Built Around Real Desks

Two workflows, one intelligence layer

Forged is being designed around the two estimating workflows that actually receive these packages.

Material & PVF Estimating

Material RFQ packages

  • BOM and material-list review
  • Product identification
  • Specifications and material grades
  • Quantities and sizes
  • Required documentation
  • Pricing development
  • Exceptions and clarifications
  • Estimator review
  • Final quote development
Fabrication Estimating

Fabrication drawing packages

  • Drawing and specification review
  • Fabrication requirements identified
  • Quantity and takeoff development
  • Material requirements
  • Fabrication requirements
  • Exceptions and clarification items
  • Estimator review
  • Fabrication pricing and quote development

The Workflow

How It Works

Six stages from project documents to a prepared quote. Stages 01–03 run today through Forged Intake; pricing development, estimator review and quote release remain with Smithco’s estimating team.

01

Project Document Input

Forged Intake accepts the project information Smithco receives every day, including RFQ packages, IFC drawings, architectural and structural drawings, specifications, schedules, BOMs and other supporting documents.

02

Requirements Extraction

Forged identifies relevant project requirements, material requirements, quantities, specifications and drawing references, then organizes that information for estimator review.

03

Structured Estimating Data

Extracted information is organized into a consistent estimating structure, including material descriptions, quantities, specifications, grades, drawing references and other project requirements.

04

Pricing Development

The structured estimating package provides Smithco estimators with the organized information needed to develop material and fabrication pricing.

05

Estimator Review

Experienced Smithco estimators review and validate the structured project information, resolve exceptions and clarification items, and maintain control of the commercial quote before release.

06

Quote Review & Release

Following estimator review and validation, the approved information is used to prepare the customer quote. Final commercial review and quote release remain with Smithco’s estimating team.

Smithco Forged is being developed to support Smithco’s established estimating and project workflows, with experienced personnel maintaining oversight of review, documentation and release. Applicable project requirements and industry standards — including AISC, ASME Section IX, AWS D1.1 and SMACNA — remain incorporated into Smithco’s project execution and quality processes.

Next Step

Send us the requirement. Forged helps turn complex project documents into structured estimating information.

From complex drawing packages to large material RFQs, Forged Intake shortens the path from project documents to an executable quote while keeping experienced Smithco estimators in control of review, validation and release. Submit your project documents through Forged Intake above — or through the contact page — and our estimating team will review the requirements and develop the appropriate material or fabrication quote.

Request a Quote See How We Help

888-727-4044 · sales@smithcois.com